FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. AEE Certification
  3. CEM Exam
  4. AEE.CEM.v2026-10-03.q67 Dumps
  • ««
  • «
  • …
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • »
Download Now

Question 56

A hot-water boiler has a cut-in set point of 65°C on the hot water supply temperature and a differential set point of 10°C. What is the hot-water supply temperature that causes the boiler to turn off?

Correct Answer: B
insert code

Question 57

An energy project implemented today saves $10,000 per year for the next 20 years. Using the 5% interest table, determine the total value of savings at the end of the 20th year?

Correct Answer: A
insert code

Question 58

A piece of equipment costs $250,000 to buy and install. The annual operating cost for the equipment is
$50,000 per year. The equipment will last 15 years. After 15 years, the equipment will have no net salvage value. The annual interest rate is 10%. What is the present value of the life-cycle cost to own and operate the equipment? Use end-of-year annual cash flow analysis.

Correct Answer: B
insert code

Question 59

Calculate the monthly electric bill for a customer that used 400 kW and 75,000 kwh during one month. Use the following declining block structure for a monthly bill:

SELECT THE CORRECT ANSWER

Correct Answer: D
We need to calculate the monthly electric bill based on the given pricing structure.
Step 1: Identify Charges from the Table
* Customer charge:$50/month
* Peak demand charge:$10/kW-month
* Electric consumption charges:
* First25,000 kWh@$0.06/kWh
* Excess(75,000 - 25,000) = 50,000 kWh@$0.05/kWh
* Tax:20% of total
A screenshot of a calculator AI-generated content may be incorrect.
insert code

Question 60

A facility has a monthly peak power demand of 1,000 kW and an average power factor of 80%. The facility pays a demand charge of $7.50/kVA-month. What is the additional cost per month because the power factor is less than 100%?

Correct Answer: C
To calculate the additional cost due to a power factor of less than 100%, follow these steps:
Step 1: Convert Real Power (kW) to Apparent Power (kVA)
A math equations with numbers and a few lines AI-generated content may be incorrect.

Step 2: Compute Additional kVA Due to Power Factor
A white background with black text AI-generated content may be incorrect.
insert code
  • ««
  • «
  • …
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • »
[×]

Download PDF File

Enter your email address to download AEE.CEM.v2026-10-03.q67 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.