When equipment has deteriorated to such an extent that the risk of failure cannot be managed and held to an acceptable level, often the only way to mitigate risk is to:
One of the key elements of an inspection plan is:
A RBI analysis shares many of the techniques and data requirements with a ____________.
........Is not a substitute for a process hazards analysis (pha) or hazop
If operating condition have changed, deterioration rates based on inspection data from the previous operating
conditions