The resources used in changing inputs to outputs are usually known as:
1. Wrong product or specification
2. Wrong amount (too little or too much)
3. Wrong shipping date (too early or too late)
These are common errors in that occur all the time and require constant attention.
The quantity on hand plus the quantity ordered must equal the sum of the demand during the lead time plus the demand during the review period plus safety stock.
What involves long-range capacity resource requirements and is directly linked to production planning?
Which of the following is/are included in five major levels in the manufacturing planning and control system?