FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. ASIS Certification
  3. PSP Exam
  4. ASIS.PSP.v2026-03-30.q200 Dumps
  • ««
  • «
  • …
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • …
  • »
  • »»
Download Now

Question 141

Using the normal schedule, what is the owner's total cost of the project?

Correct Answer: B
Owner's total project cost is calculated by summing all direct and indirect costs, including any adjustments for delays or bonuses.
Using the normal schedule, the provided cost aligns with $12,990,000 after applying standard rates and durations.
References: PSP Study Guide, Section 1.3.10 - Cost Estimate Development, which highlights cost aggregation methods.
insert code

Question 142

Which statement is true?

Correct Answer: D
* Compensability and Excusability:
* Excusable delays are those beyond the contractor's control, while compensable delays are excusable delays for which the owner bears responsibility.
* If a delay is compensable, it inherently qualifies as excusable.
* PSP Study Guide References:
* The relationship between excusability and compensability is clarified in delay analysis discussions.
* Conclusion: The correct answer is D, as compensability implies excusability.
insert code

Question 143

In order for a claimant to be entitled to an extension of contract time for a delay event (and further to be considered compensable):

Correct Answer: D
insert code

Question 144

During proofing of the product manual, a problem was discovered requiring 15 days additional time to affect a correction. How can the date of availability be maintained?

Correct Answer: D
To maintain the product availability date while accommodating a 15-day delay in proofing corrections, the best course of action is to expedite another activity on the critical path. The PSP Study Guide outlines methods for schedule recovery and acceleration (Section 2.3.5, "Acceleration"). Expediting the Draft Product Manual by 5 days helps redistribute the time lost, aligning subsequent tasks to achieve the original completion milestone without delaying the overall schedule.
insert code

Question 145

SUBCO is a potential concrete bridge contractor based in a metropolitan area 300 miles away from your project. They have offered to supply manpower and equipment t BILCO at a per diem rate of $3,000 above their direct labor and equipment rates. In doing a cost benefit analysis, which of the following is NOT a consideration?

Correct Answer: C
insert code
  • ««
  • «
  • …
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download ASIS.PSP.v2026-03-30.q200 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.