| Exam Code/Number: | 7003Join the discussion |
| Exam Name: | Avaya Communication Server 1000 for Avaya Aura® Implementation Exam |
| Certification: | Avaya |
| Question Number: | 65 |
| Publish Date: | Oct 15, 2026 |
|
Rating
100%
|
|
A customer with a Communication Server (CS) 1000E Rls..5.5 with two IPMGs is upgrading their system to release 7 x. The Upgrade system will have two IP media
Gateways.
Which two statements are true regarding DSP resources for the IP Media gateways in the
Upgrade System? (Choose two)
A customer is adding a new Avaya Communication Server (CS) 1000E Rls. 7x server within their existing release 7x network. The CPMG based server will become member server within an existing CS 1000 Rls. 7.0x security domain.
Which statement describes the process you should use to simultaneously install Linux
Base and deploy application to the CPMG Co-Resident server?
A technician is planning to upgrade a customer's existing Communication Server 1000E Rls. 6.0 system.
During the upgrade, a CPPM server card from storage will be added to provide an additional signaling server.
Which two statements describes what must be done to the CPPM server card to distinguished it as a signaling Server (Choose two)
A customer purchased a new Communication Server 1000E SA system with five media gateways which includes:
MG 1: CPMG (Call Server, Signaling Server, Media Gateways Controller)
MG 2: Media Gateway Controller
MG 3: Media Gateway Controller
MG 4: Media Gateway Controller
MG 5: Media Gateway Controller
Which statement is true regarding the configuration of Media Gateway?
A customer with an existing Option 11C Rls. 5.5 chassis system plans to upgrade to a
Communication Server (CS) 1000E Rls. 7x Standard Availability with a single IP Media
Gateway (MG) 1000E chassis.
To complete the upgrade, which component in the Option 11C must be replaced?