A customer has an international presence and a strong brand image. The customer considers the exceptional quality images used for both print and on the website to be essential for its business, The customer uses AEM 6.5 managed services with a configuration of 2 dispatchers, 2 publishers, and 1 author.
The original images can weigh up to 500Mb with videos weighing even more. Renditions are generated after files are uploaded to AEM DAM by the Design team so the Authoring team can use them on the website.
The teams report issues with platform stability and slowness. Visitors report that images look pixelated on some screens and pages are very slow to load.
Which two actions should the Architect take to resolve these issues? (Choose two.)
During development the AEM Publisher server keeps crashing randomly. The deployment included a new static FAQ component that was used in the websites Contact Us page. An Architect investigates to find the root cause for the random failures, and notices the following parameters:
* The server slows down when requests are sent to the Contact us page
* The number of requests to the page were very few
* Heap dump shows a large number of instances of the FAQ component
What is likely causing this issue?
A large AEM enterprise site is implementing authentication and requires a true optimal load balancing across the site's multi AEM publish instances. Which approach should an Architect take to meet this requirement?
A client has an existing AEM site using components that proxy AEM WCM Core Components. The site uses simple page authoring without referenced content, The client wants to create a new experience on another marketing channel. The plan is to use as much of the existing page content as possible to avoid refactoring the current content and to maintain consistency across channels.
Which AEM capability should an Architect use to meet these requirements?
An AEM Architect is moving existing content from an on-premise AEM to an AEM Cloud Service instance using the Content Transfer Tool. As part of the initial source preparation, the Architect is going to run the offline compaction on the on-premise AEM.
What other two actions should the Architect do to the on-premise AEM before proceeding with the extraction phase? (Choose two.)