During a sprint retrospective meeting, you need to get the team thinking about the outcomes of the last sprint.
Which two basic questions should you ask? (Choose two.)
You are designing a case management application. The initiator creates a case, and the reviewer reviews it approximately 7 days later.
You have already designed a process model for the initiators to create the case.
Which process model design will result in the lowest memory impact? (Choose the best answer.)
You need to build a QC review process for a factory that allows a technician to review each production line on a regular basis.
A QC technician has 30 minutes to complete their review, after which time the review will expire and be marked as a "missed review." If this, occurs, a supervisor should be notified via email and the review data should not be saved. Additional requirements are as follows:
The user should be able to save a draft of their review before submission, and come back to work on it later.
Once submitted, the review data should be saved to the database.
Which option needs to be implemented to meet the requirements?
You are analyzing a poorly-performing process model.
You find that the process model in question has a lot of nodes and is mainly used to do background updates.
Which two things can be done to increase its performance? (Choose two.)
Which review format is the most efficient way to coach team members and improve code quality? (Choose the best answer.)