FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. CIMA Certification
  3. P3 Exam
  4. CIMA.P3.v2022-11-28.q100 Dumps
  • ««
  • «
  • …
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • …
  • »
  • »»
Download Now

Question 41

Company W produces mobile phone components and has recently tendered for a substantial contract. The results of the tendering process will not become available until three months from now. If the company is successful it will require 2,000 units of a commodity which is currently traded in an open commodity market for $740 per unit. However, there has been speculation that this commodity could increase substantially in price over the next three months and so the company is considering purchasing the commodity now and storing it for three months.
The funds to buy the commodity would be borrowed at an annual interest rate of 7% and the storage cost of the product would be $5.40 per unit per month. The storage costs would be paid at the end of the three month storage period.
Which of the following represents the gain or loss (to the nearest thousand dollars) that will accrue to Company W assuming that the price of the commodity rises to $800 in three months' time?

Correct Answer: B
insert code

Question 42

You have just been employed as a management accountant in a small business with an annual turnover of $0.5 million.
You have a wide range of duties because the business is small.
Which of the following is an ethical risk?

Correct Answer: C
insert code

Question 43

The internal audit department has just completed an investigation into the HR department's procedures relating to new staff appointments The head of HR is unhappy with the draft report prepared by the lead internal auditor The report lists several cases in which appointments were made despite the fact that one or more of the entity's formal procedures were not followed The head of HR has complained that the internal auditor's comments do not allow for the fact that the HR department's staff members are often very busy and do not always have time to conduct every check.
The internal auditor's comments also reflect a failure to complete documents None of the omissions have led to the appointment of an unsuitable member of staff Which TWO of the following statements reflect an appropriate response by the board of directors to this report?

Correct Answer: B,D
insert code

Question 44

SC is a professional football club which is currently listed on a recognised stock exchange. There is a proposal that it builds a new stadium at a location a considerable distance from its current stadium.
There is strong support within the club for the move as the current ground is now over 40 years old and has not been extensively modernised in that time.
However, there is a lot of opposition to the move in the area where it is proposed to locate the new stadium. Objectors claim that the new stadium will increase traffic and pollution in the area and will adversely affect the value of their properties.
Which of the following statements about the responsibility of the board of SC is correct?

Correct Answer: A,C
insert code

Question 45

An electricity company owns and operates a nuclear power station located ten miles from a large city. A recent and very extensive engineering examination of the power station concludes with the estimate that the probability of a major nuclear disaster within the next 20 years is 0.2%.
Which of the following best explains the relevance of quantifying the risk in that way?

Correct Answer: B
insert code
  • ««
  • «
  • …
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download CIMA.P3.v2022-11-28.q100 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.