An engineer must implement a disaster recovery policy for the Cisco UCS infrastructure. The solution must meet these criteria:
* The Recovery Point Objective must be 48 hours.
* The backup must use encrypted transmission.
* The Recovery Time Objective must be 4 hours.
Which configuration set must be used in the scheduled backup to meet these requirements?
Refer to the exhibit.
In a bidirectional PIM network using Phantom RP as an RP redundancy mechanism, two Cisco NX-OS routers have these requirements:
* R1 must be the active RP.
* R2 must be the backup RP that is used only if R1 is not reachable
Drag and drop the configuration steps to complete the configuration for Router 2. Not all configuration steps are used.

Refer to the exhibit.
In a bidirectional PIM network using Phantom RP as an RP redundancy mechanism, two Cisco NX-OS routers have these requirements:
* R1 must be the active RP.
* R2 must be the backup RP that is used only if R1 is not reachable
Drag and drop the configuration steps to complete the configuration for Router 2. Not all configuration steps are used.

Which two actions should be taken before an upgrade is started on a Cisco MDS switch? (Choose two.)
An engineer configures a role for a new user in Cisco UCS Manager The role should allow the user to configure vHBAs, vNICs, and server port types. Which role should be assigned to allow the engineer to complete this task?

