FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. Cisco Certification
  3. 800-150 Exam
  4. Cisco.800-150.v2026-04-15.q67 Dumps
  • ««
  • «
  • …
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • …
  • »
  • »»
Download Now

Question 41

What must be verified before installing or replacing DIMMs in a Cisco UCS server?

Correct Answer: B
Before installing or replacingDIMMs (Dual In-line Memory Modules)in a Cisco UCS server, it is essential to verify thecurrent DIMM configuration and the population order. Cisco UCS servers have strict memory population rules to ensure optimal performance and compatibility, particularly in relation to memory channels and banks.
While the type, capacity, and firmware compatibility are important, failing to follow the correct population guidelines can result in failed boot processes or suboptimal performance.
Reference:Supporting Cisco Devices for Field Technicians (FLDTEC) - Cisco Equipment and Related Hardware
insert code

Question 42

What is the primary advantage of the Cisco Intersight cloud-based approach compared to traditional on-premises management tools?

Correct Answer: C
The main advantage of Cisco Intersight is its cloud-based architecture, which allows IT administrators to manage infrastructure from any location without needing to install or maintain traditional on-premises management tools.
This provides:
Centralized visibility and control over UCS servers and HyperFlex infrastructure Remote firmware upgrades and configuration Policy-driven automation Unlike on-premises tools, Intersight eliminates the overhead of maintaining dedicated infrastructure for management.
insert code

Question 43

Which step must be performed immediately after disconnecting the network cable when replacing an SFP transceiver module?

Correct Answer: C
After disconnecting the network cable from an SFP transceiver, theimmediate next step is to reinstall the dust plugsinto the optical bores. This action prevents contamination from dust or debris that can damage the optical interfaces or degrade performance.
It's important to protect the exposed optical port before handling the rest of the transceiver module. Dust plugs help maintain the integrity of the component until a new cable or module is connected.
Reference:Supporting Cisco Devices for Field Technicians (FLDTEC) - Maintenance and RMA Procedures
insert code

Question 44

Refer to the exhibit. Drag and drop the names of the field-replaceable units from the left onto the corresponding letters on the image of the Cisco Catalyst 9400 modular switch.

Correct Answer:

Explanation:
A # Power supply modules
B # Fan tray assembly
C # Line card slots 1 and 2
D # Supervisor modules
E # Line card slots 5, 6, and 7
The power supply units (A) are at the top, the fan tray (B) is a vertical module on the left, line cards (C and E) span multiple slots horizontally, and supervisor modules (D) are typically placed centrally for control functions.
In theFLDTEC courseunderCisco Modular Hardware Overview, the Cisco Catalyst 9400 series is broken down into clearly defined FRU zones:
* Power Supply Modules (A):Located at thetop of the chassis, these provide redundant, hot-swappable power to the switch.
* Fan Tray Assembly (B):Mounted vertically on the left, this ensures proper cooling and airflow throughout the chassis.
* Line Card Slots 1 and 2 (C):Located in the upper section for network expansion.
* Supervisor Modules (D):Positioned centrally, they handle control plane operations, management, and switching logic.
* Line Card Slots 5, 6, and 7 (E):Lower slots for high-density port expansion.
Correct FRU identification ensures successful maintenance, upgrades, and hardware replacement during field operations.
insert code

Question 45

What is the purpose of the pre-service checklist in the endpoint replacement process?

Correct Answer: A
Apre-service checklistis a procedural step followed before replacing an endpoint. Its primary purpose is to confirm that all resources, tools,documentation, and personnel are in placeto execute the replacement efficiently and without delays.
It helps avoid service interruptions and ensures a smooth replacement by ensuring that every necessary component and action is accounted for ahead of time.
Reference:Supporting Cisco Devices for Field Technicians (FLDTEC) - Maintenance and RMA Procedures
insert code
  • ««
  • «
  • …
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download Cisco.800-150.v2026-04-15.q67 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.