A technician is installing a wireless access point and is required to run all cabling and make patch cords if necessary.
INSTRUCTIONS
Part 1
For each cable type, click the (+) to select the appropriate connector and tool.
part 2
An access point was moved and no longer has connectivity. Connect the access point, patch panel, and switch by clicking the (+) to select the appropriate cable end for each corresponding location to create a link.
The link will be visible after making the second selection of each pair.
Cable ends may be used multiple times, and all placeholders will be filled.


A technician receives complaints that a network fileshare is slow and now unavailable. The server is powered on and accessible via RDP. What should the technician check next?
A company is testing the latest model of a laptop. After turning on the laptop, there is a noticeable burning smell. Which of the following steps should a technician take to troubleshoot the laptop issue? (Select two).
A network administrator must ensure that a printer will still be assigned a specific IP address even if all addresses are depleted. Which of the following network configuration concepts is this describing?
Which of the following services is used to allocate IP addresses in an enterprise-wide environment?