An analyst is developing a proof of concept of a wireless-based attack as part of a penetration test against an organization's network. As part of the attack, the analyst launches a fake access point matching the SSID of the organization's guest access network. When a user connects to the fake access point, the analyst allows the traffic to flow through the access point to the legitimate site while the data traversing the network is logged for latest analysis and exploitation. Which of the following attacks has the analyst successfully performed in this scenario?
Workstations are unable to access the Internet after a recent power outage. Configure the appropriate devices to ensure ALL workstations have Internet connectivity.
Instructions: All ports can be enabled (green) or disabled (red). When you have completed the simulation please select the Done button.

Corporate headquarters provided your office a portion of their class B subnet to use at a new office location.
Range Given: 172.30.232.0/24
Sales 57 devices
HR 23 devices
IT 12 devices
Finance 32 devices
Marketing 9 devices
INSTRUCTIONS
Allocate the minimum number of addresses (using CIDR notation) needed to accommodate each department.
After accommodating each department, identify the unused portion of the subnet by responding to the question on the graphic.
All drop downs must be filled.
If at any time you would like to bring back the initial state of the simulation, please click the Reset All button.


A network technician receives a request for a disaster recovery solution. Management has requested no downtime in the event of a disaster. Which of the following disaster recovery solutions is the appropriate choice?
A network administrator is assigned to run and connect a Cat 6e Ethernet cable between two nodes in a
datacenter. Which of the following connector types should the network administrator use to terminate this
cable?