Which tool is essential for completing a PowerScale cluster configuration that is compliant with specific industry standards?
Before performing hardware maintenance on a PowerScale node, why is it important to document the existing cabling setup?
What are the essential verifications after preparing a PowerScale node for operation? (Select two)
A platform engineer needs to power down a Dell PowerScale node to perform an FRU replacement.
Which command should they run first before making the replacement?