An HPE Synergy customer needs to prevent a timeout and loss of communication during an external switch firmware upgrade.
Click the parameter that the customer should configure within an uplink set to meet this requirement

Your customer has an HPE Synergy frame equipped with a D3940 Storage Module. Each of the compute nodes has the appropriate storage controller installed and two 12Gb SAS switches installed in the first fabric.
The customer reports that the compute nodes cannot access the storage module.
What will you verify first when troubleshooting this problem?
Your customer plans to add four HPE Synergy frames to an existing management ring Ail installed frames are equipped with two 2-port FLM modules, while new frames will be equipped with 4-port FLM modules.
Which statement about mixing different FLM modules is true?
Your customer plans to use HPE Primera to boot HPE Synergy compute nodes. They currently have two HPE Virtual Connect SE 100Gb F32 Module for Synergy modules installed in the frame. The customer wants to use FC as a storage access protocol What must be done to complete this task?
In the past a customer experienced a networking issue where network ports went down and came back up in quick succession.
Which HPE Virtual Connect SE 100 GD F32 Module for HPE Synergy feature can be configured to disable such ports?