A customer needs a new environment to support an ERP system. The sizing information you received shows the following requirements:
* 3 servers with dual AMD processors, 256GB RAM, and 10Gb network connectivity
* 10TB of high performance shared storage
* Cloud-based performance monitoring and analytics
The customer prefers rack mounted equipment.
Identify the components that will meet the customer requirements, then drag the correct components on the left to their appropriate location in the environment on the right.


Refer to the exhibit.
You are designing a new Nimble AF40 for your customer. The array will be added into an existing Nimble HF60 environment connected with SN6000B switches. You have created the configuration shown in the exhibit and noticed an error What should you change in your configuration to ensure it meets the customer requirements?
You are validating a configuration prior to quoting it for the customer. You plan to propose the following configuration:
* Two HPE DL380 Gen10 servers with dual processors, 256GB of memory, dual 10Gb NICs, SN1100Q
16Gb dual port FC HBA, dual 800W power supplies, and high temperature fan kit
* HPE Nimble HF20H with 11TB storage, 960GB of cache, dual port 10GbE NIC, and 16Gb dual port FC adapter kit
* Two SN3000B FC Switches
Which tool should you use to verify firmware compatibility between the storage and server components in this proposed solution?
Which HPE Proliant server should you recommend for a home office environment where the server will be located in the same office as the user?