A customer needs a new VMware environment for a critical stock trading application and will need high performance compute and low latency storage.
Identify the correct component configurations on the left and drag them to the answer area on the right. (Choose two.)

A customer is planning to deploy a branch office server rack. The environment will have the following requirements:
Single rack with 20 HPE ProLiant DL360 Gen10 Servers.
Each Server will have 6 x 10G SFP+ Ports.
Each Server will have a dedicated iLO port.
The customer requires that only two switches be used.
The customer requires separate control planes.
Which switch configuration can meet these requirements?
A customer is considering an upgrade of their networking infrastructure with HPE FlexFabric 5940 series switch.
Match the fan tray option with the airflow direction.


A customer has two HPE ProLiant Gen10 servers. They both require firmware installation.
Which HPE tool should you recommend for performing this task?