You are configuring Ethernet Ring Protection Switching (ERPS) on an ArubaOS-CX switch. Is this a guideline for configuring timers?
Solution: The hold off timer causes ERPS switches to delay unblocking a failed link after the link is restored. This can be useful to prevent frequent topology changes.
Can you attach this type of ArubaOS-CX interface to a VRF?
Solution: A physical interface using Layer 2 mode
Refer to the exhibit. The company wants AtubaOS-CX switches to provide VXLAN services for several VMs and servers, as shown in the exhibit. Hypervisors will not run VXLAN for this solution. Is this part of a valid configuration to meet the requirements?
Solution: Work with the server admins to assign a consistent VLAN for VMs 1 and 4. Assign interface 1/1/2 on Switch-1 to the same VLAN.
Refer to the exhibit. The company wants AtubaOS-CX switches to provide VXLAN services for several VMs and servers, as shown in the exhibit. Hypervisors will not run VXLAN for this solution. Is this part of a valid configuration to meet the requirements?
Solution: Attach VNIs 5010 and 5020 to interface 1/1/3 on Switch-2.
Does this correctly describe how Network Analytics Engine (NAE) agents work?
Solution: Agents write data to the switch's current state database.