Refer to the exhibit.
The exhibit shows the design for an existing network. The customer intends to replace the current Core switches with two Aruba 8400 switches.
What are two points that the architect should ensure that the customer understands? (Select two.)
For which scenario do Aruba CX 6300M Series switches meet the needs for an upgrade of the wired access layer while the Aruba CX 630QF Series switches do not?
A customer requires new MCs for a large multi-site network with about 600 AP-535S ana 30,000 wireless clients. The customer requires redundancy for the MCs, with each MC being able to handle the full toad in a failover situation The network should be able to sustain the loss of a controller with stateful failover within seconds. It should be able to undergo software upgrades without downtime.
The architect has recommended two 7240XM MCs. The customer points out that 7220 MCs can support their requirements and wonders why the architect recommended me 7240XMS.
What should the architect explain?
Refer to the exhibit.
A customer needs a wireless network upgrade and has these requirements.
- Support any applications used on a wired connection
- Support up to 2500 wireless clients
- Support seamless roaming from floor to floor and building to building
- Continue to function seamlessly if one controller fails
The architect has designed the logical infrastructure for the network as shown in the exhibit Which change should the architect make to belter meet customer requirements and besl practices?
A hospital needs a Getter way to track its inventory Including wireless medical devices that are moved around the site a lot.
Which solution meets these needs?