Which of the following measures does the NetEco management system take to ensure the security of the software platform and prevent the leakage of business sensitive data? (Multiple choice)
Using UPS5000-E (50kVA power module), the actual load is 160kW, the rack is 1+1 redundant, the single-machine backup power scheme is adopted, the backup power scheme for each machine, 3 sets of batteries per rack, 40 cells per set, the capacity of the main switch box is:
In order to realize the remote notification of the alarm time on NETECO, which of the following tasks need to be set? (Multiple choice)
When the device interface uses the MODBUS-RTU protocol, ( ) needs to be installed when connecting to the ECC800.