The NetEco6000 management system can provide monitoring of the cooling power system, which of the following functions can it provide? (Multiple choice)
The user can modify the IP address of the ECC800 from the () menu on the ECC800WEB interface.
Which of the following models has the widest input voltage range and is more suitable for harsh power grids?
What factors are currently affecting the application of HVDC equipment in the computer room? (Multiple choice)
A project requires the management system to access two third-party generator sets (same model), one ATS (same model), six precision air conditioners (same model), and five smart meters (same model), then How many third-party device access fee does the management system need to report?
Enter your email address to download Huawei.H12-425_V2.0-ENU.v2024-07-11.q170 Dumps