According to the requirements, before OTN 6800/8800 equipment is upgraded, it is necessary to return the network element health check file to TAC analysis
When planning AM, you need to consider the priority planning of E1. Which of the following options are the planning principles of E1 priority (multiple choice)
The ring network of the OSN6800 equipment group was newly opened, and ODU1-SNCP/N protection was enabled. The engineer reported that a switch occurred one day and has not been restored, but there is no problem with the optical cable. There is an ODU_SNCP_PS alarm on the corresponding ND2 optical port.
Possible reasons are: (multiple choices)
Enter your email address to download Huawei.H12-931-ENU.v2022-03-26.q100 Dumps