| Exam Code/Number: | H13-629_V2.5Join the discussion |
| Exam Name: | HCIE-Storage V2.5 |
| Certification: | Huawei |
| Question Number: | 740 |
| Publish Date: | Jan 07, 2026 |
|
Rating
100%
|
|
A company plans to deploy a disaster recovery system, which requires that when a data center-level failure occurs, the business will not be interrupted and business data will not be lost; it plans to use two places and three centers to interconnect, which of the following solutions can meet the requirements?
In Huawei storage systems, the ( ) advanced feature can create a full data copy (that is, the target LUN) of the source LUN at a specific point in time (the time when synchronization is started), and the target LUN can be read and written immediately without waiting for the background copy to complete. . (Please fill in in English)
The customer's business is very important and has a large amount of data. It needs the best possible business continuity. At the same time, it is required to provide services to the outside world in the event of a natural disaster (flood/earthquake). Please design a disaster recovery network. Which network will you choose?
Which of the following Oracle database best practice description is correct? (Multiple Choice)
When all BBUs of the storage controller are damaged, the controller automatically sets the I/O write policy to write-through and locks to ensure data reliability, and cannot be forced to write-back before the fault is recovered.