| Exam Code/Number: | H20-681-ENUJoin the discussion |
| Exam Name: | Huawei Certified Field Specialist -Smart PV Controller |
| Certification: | Huawei |
| Question Number: | 195 |
| Publish Date: | May 31, 2026 |
|
Rating
100%
|
|
Islanding Effect refers to the effect that the grid-connected photovoltaic power generation system still maintains the power supply status to the adjacent part of the grid when the power grid suddenly loses pressure.
Using the USB flash drive, you can perform ( ) to SmartLogger2000. (Multiple Choice)
Which of the following description about the operation of the software are correct? (Multiple choice)
When installing the AC line of the Huawei SUN2000 inverter, it is recommended that the stripping length of the insulation layer be 2mm~3mm longer than the crimping area of the OT terminal sub cable for convenient wiring. After pressing the terminal, the place of line needs to be covered with a heat shrinkable T bush or insulating rubber tape.
When the PV sub-array adopts Huawei PLC communication networking, the knife-melting switch needs to be added between the box-changing busbar and the Huawei PL CCO module. The rated current of the fuse cannot be less than ____.