| Exam Code/Number: | C4040-332Join the discussion |
| Exam Name: | High Availability for AIX - Technical Support and Administration -v2 |
| Certification: | IBM |
| Question Number: | 132 |
| Publish Date: | Jul 22, 2026 |
|
Rating
100%
|
|
An administrator is migrating from PowerHA 5.4.1 to PowerHA 6.1. Which migration option creates the least amount of downtime for the clustered application?
A cluster resource group has following application server characteristics:
An application server start script starts process A and process B.
An application monitor with the following settings: long-running, monitor interval=60, stabilization interval=180
The monitor method checks process B. and if process B is down it restarts process B and exits with return code 0.
When the cluster is started, an administrator finds process A is down and output of cluster.mmddyyyy log file is as follows; What happened?
Failure to plan for which element will have a negative impact on PowerHA cluster availability, when using virtual I/O resources on the cluster nodes?
The administrator has written a script "correct_problem.sh" that needs to be run if the "release_vg_fs" event does not complete successfully.
What should be done to ensure the correct_problem.sh is called a maximum of 3 times if the event failed?
Consider the following PowerHA DLPAR configuration for a cluster, and LPAR profile on the HMC for a standby node in that cluster:
How should the standby node profile be reconfigured so that an application runs with the minimum
hardware resources?