Identify the correspondences between the different tools (listed from 1 to 3) and their objectives and characteristics (listed from A to F).
1. Load generator.
2. Load management console.
3. Monitoring tool.
1. It monitors, records and/or analyzes the behavior of the component or system under test.
2. It creates the load and also collects the metrics for later communication.
3. It provides the control to start and stop the creation and execution of the user simulation.
4. It aggregates metrics from the various transactions that are defined within the load instances
5. It creates and runs multiple client instances that simulate user behavior.
6. It can effectively support a root cause analysis of performance in a system under test.
SELECT ONE OPTION
Associate each type of performance test (listed from 1 to 5) with part of a description that allows its characterization and/or identification (listed from A to E).
1. Endurance testing
2. Scalability testing
3. Capacity testing
4. Stress testing
5. Concurrency testing
1. Type of testing focused on the ability of a system to meet future efficiency requirements.
2. Type of testing used to evaluate a system's ability to handle reduced availability of resources.
3. Type of testing focused on the stability of the system over a specific time frame.
4. Type of testing used to determine the number of transactions a given system will support while still meeting established performance objectives.
5. Type of testing focused on the impact of situations where specific actions occur simultaneously.
SELECT ONE OPTION
In this question, consider that test scripts are generated from a protocol level recording. At the end of the recording, an attempt was made to execute the recorded scripts without any processing, and it was not possible to play them back.
Question
What could be the reason why it is not possible to play back the script?
SELECT ONE OPTION
(REFER TO BASE SCENARIO 2): IV/rerj you refer to Base Scenario 2, you are referring to the description and only the description, without any modification.
Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).
Throughout the month of January (31 days), the company performed 3,100 departure operations from the Capital City Airport. These departure operations transported 465,000 passengers during the hours of operation, from 07:00 to 23:00.
The departing passengers (one of the most relevant operational profiles) will access the front-end of the application to check in for their flight. It is known that 30% of departing passengers reconnect after checking in to request the boarding pass to be resent or printed.
Question
A performance test will be carried out for which 11,700 transactions will be necessary to simulate an operation similar to that described in the base scenario and the restrictions of this question. How many virtual users will be necessary to achieve this number of transactions and the conditions of the operations?
SELECT ONE OPTION
Select the ONE option that describes the mechanism used to extract metrics associated with deadlocks and multi threading problems SELECT ONE OPTION