You need to identify all potential gaps in the master planning solution for Adventure Works' implementation.
What should you do?
An airport uses Dynamics 365 for Finance and Operations. You purchase new baggage-sorting hardware.
You must add both the hardware and the service contract for the hardware to the product hierarchy.
You need to configure the category node.
What should you do? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

A company is designing a new bicycle by using a dimension-based Bill of materials (BOM).
The configuration groups have been defined and created.
You need to set up a BOM for the new bicycle.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.


You are a Dynamics 365 for Finance and Operations security administrator.
You have 50 identified purchase order numbers that are not used in the system and are not being recycled.
Why they are missing is unknown. Purchasing operations is currently operating around the clock and no downtime can occur.
You need to use the missing numbers in the system.
What should you do?
You run Planning Optimization. You create a static master plan with a plan filter for A and B items.
Purchasing agents for the A items start to review the A item output. You must re-run planning for the B items due to a change. Re-running the B items must not impact the existing planned orders for the A items.
You need to re-run planning for the B items.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
Select all answers that apply.