FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. Microsoft Certification
  3. MB-335 Exam
  4. Microsoft.MB-335.v2023-11-30.q47 Dumps
  • ««
  • «
  • …
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • »
Download Now

Question 31

You are building the Bill of materials (BOM) for a new production item. The new item has a subcomponent.
Subproduction orders for the subcomponent must be created when estimating production orders.
You need to configure the BOM line to generate sub production orders.
Which BOM line type should you use?

Correct Answer: B
The BOM line type determines how the line is handled during master planning and batch order production1. The Item line type indicates that the item is a material or service that is directly consumed, and that doesn't require further explosion or pegged supply1. When you estimate a production order for an item that has a BOM line with the Item line type, a subproduction order is created for the item2.
The other options are not correct, because they do not generate subproduction orders. The Vendor line type indicates that the item is purchased from a vendor and not produced internally1. The Phantom line type indicates that the item is an intermediate product that is used to simplify the design process and group complex products into engineering modules1. The Pegged supply line type indicates that the item is supplied by another production order or transfer order, and that the supply must be reserved before it can be consumed1.
insert code

Question 32

A company plans to account for indirect costs related to materials used to manufacture products.
The items used to manufacture products have surcharge rates that depend on the type of product being used.
You need to set up the costing sheet to include surcharges for specific items.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Correct Answer:

1 - Create cost groups for indirect and direct costs
2 - Create a node-type sucharge under the indirect cost group..
3 - Assign a cost group to the items
insert code

Question 33

You need to set up the configuration model to price the motorcycles correctly. What should you do?

Correct Answer: A
insert code

Question 34

You need to modify the production order defaults for the manufacturing execution production order Start process.
What should you do? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Correct Answer:
insert code

Question 35

You need to configure costing for raw materials used to manufacture unscented cleaning solution.
Which form should you use?

Correct Answer: B
Reference:
https://docs.microsoft.com/en-us/dynamicsax-2012//quantity-and-margin-template-form?
redirectedfrom=MSDN
insert code
  • ««
  • «
  • …
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • »
[×]

Download PDF File

Enter your email address to download Microsoft.MB-335.v2023-11-30.q47 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.