FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. Microsoft Certification
  3. MB-335 Exam
  4. Microsoft.MB-335.v2024-01-19.q48 Dumps
  • «
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • …
  • »
  • »»
Download Now

Question 1

You need to configure the requirements for metal fabrication equipment maintenance. What must you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Correct Answer:
insert code

Question 2

You need to configure production operations for the pine and orange scent solutions.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

Correct Answer: A,C,D
insert code

Question 3

You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Correct Answer:

Explanation
Graphical user interface, text, application, email Description automatically generated

Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/dimension-based-product-configuration
insert code

Question 4

A manufacturer uses Dynamics 365 Supply Chain Management to create bicycle parts as a configure-to-order configuration. All bicycle parts are sourced from external sources and assembled in the manufacturing facility.
The manufacturer plans to expand its capabilities to create custom bicycles parts in an engineer-to-order model. All bicycle parts will be created in the manufacturing facility. The custom bicycle parts must be omitted from any master planning process.
You need to describe the concepts for the requirements.
Which concepts should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Correct Answer:

Explanation
To describe the concepts for the requirements, you should use the following:
Redesign the manufacturing facility for the new facility capabilities: You should use the Discrete concept. Discrete manufacturing is a type of manufacturing that produces distinct items that can be easily counted, touched, or seen1. Discrete manufacturing is suitable for producing custom bicycle parts in an engineer-to-order model, because it allows you to create unique products based on customer specifications and engineering drawings2. Discrete manufacturing also supports complex production processes that involve multiple steps, resources, and materials2.
Configure for the engineer-to-order items: You should use the Supply policies concept. Supply policies are rules that determine how supply is generated for a product based on its demand3. Supply policies can be configured at the product level, the product master level, or the coverage group level3. For engineer-to-order items, you can configure a supply policy that omits them from any master planning process. For example, you can set the coverage code to None, which means that no planned orders are generated for the product. You can also set the replenishment system to None, which means that no replenishment orders are generated for the product.
1: What is discrete manufacturing? 2: Discrete manufacturing overview 3: Supply policies : [Coverage codes] :
[Replenishment systems]
insert code

Question 5

A company overstates on-hand raw materials due to the time it takes to post raw materials as consumed when production orders are processed.
All items used to manufacture finished goods must be consumed when a finished good is reported as finished. You must not change all bill of materials lines to use the option of flushing principal.
You need to ensure that all production orders consume raw materials at Report as finished.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Correct Answer:

1 - In the Production order status section of Production control, select Start
2 - In the Picking list journal, select Always in the Automatic BOM consumption
3 - In the Production order status section of Production control, select Report as finished
4 - Select Make default for all users
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/production-parameters-manufacturing-execution
insert code
  • «
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download Microsoft.MB-335.v2024-01-19.q48 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2025 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.