| Exam Code/Number: | PVIPJoin the discussion |
| Exam Name: | PV Installation Professional (PVIP) Board Certification |
| Certification: | NABCEP |
| Question Number: | 162 |
| Publish Date: | Aug 28, 2026 |
|
Rating
100%
|
|
Which of the following is an NEC requirement regarding access for large-scale PV electric power production facilities?
An 8 AWG bare copper equipment ground conductor (EGC) is wire tied to the module mounting structure of a commercial rooftop solar array. After a few years of operation, some spots on the EGCbegin to turn a green color and appear to be corroding more significantly that other places. What would the MOST likely cause of the problem?
A homeowner is weighing the PV module options for a roof-mounted solar array. Which is a correct option to present to the homeowner?
A tap conduct is to be connected to a feeder supplied by both a utility service source and a utility-interactive inverter source. The feeder utility source is a 400A breaker in a service panel, the inverter overcurrent protection device is rated at 100A, and the inverter continuous output current is 72. The tap conductor that is to be installed will be 17 ft. long. It will be located in a raceway and will supply a subpanel with a 50A main breaker.
What is the MINIMUM required ampacity of the tap conductor?
A technician has been called to a scale due to a low-performing array. The technician will perform tests in the
24-source circuit combiner box. After putting on the correct PPE and turning off and performing lock.tagout of the inverted and combiner disconnect. Which is the next step to safely begin electrical testing in the combiner box?
Aug 28, 2025
Mar 18, 2022