You are an inspector on a project where SSPC SP 3 is specified.
What sort of tools should you expect the Contractor to use to achieve the standard?
Good records can provide maintenance departments with detailed information about ALL of the following EXCEPT
You are asked to be the only coating inspector on a small bridge recoating job where existing coating contains lead. The owners' representative has supplied you with the local code governing the removal and disposal of lead based coatings, however upon reading the document you having great deal of difficulty understanding the technical language.
As a NACE CIP Level 1 Inspector your preferred course of action is to:
What is the minimum spot measurement value allowed by SSPC-PA 2 in each 10 m2 (100 ft2) area?