| Exam Code/Number: | PDDJoin the discussion |
| Exam Name: | ARE 5.0 Project Development and Documentation Exam |
| Certification: | NCARB |
| Question Number: | 102 |
| Publish Date: | Jul 18, 2026 |
|
Rating
100%
|
|
Which code dictates the number of required exits for a 300-person assembly space?
Before construction documents are complete, the owner requests a review of the timeline allowed for ASIs, RFIs, RFPs, and change orders as defined in the project manual.
Which section of the project manual is relevant to this request?
An architect has a contract with a local school district to redesign a school reception office to ensure a more efficient interaction between office staff, students, and parents. The following instructions are given to the architect:
* The renovation scope is limited to the footprint only of the existing reception office.
* Additional staff is not proposed for the renovated area.
* The existing ceiling and associated fixtures will be protected from damage during construction.
* The construction of the renovation must occur during the 10-week summer break.
Which of the following series drawings should be included in the documents set?
Which of the following documents would the architect need in order to prepare the specifications?
Which of the following siding types should only be applied vertically?