Evaluation and mitigation of indoor air quality in an existing facility assessment would include participation by which of the following? Check the three that apply.

Refer to the exhibit.
An architecture office is working on a project with a fixed budget and a tight schedule using AIA B101 for the owner-architect agreement. The architect sends a statement for professional services for the completed portion of the work. Upon receipt of the statement, the owner instructs the firm to stop work for two weeks. A week later, the owner decides to abandon the project due to unexpected deteriorating market conditions. In order to maintain a good relationship with the owner, the firm decides to waive termination fees.
What is the architect's total compensation for the project?
The architect's contract with the owner has a budget of construction cost, and the architect has established a budget of cost in the mechanical engineer's contract. The mechanical bid package is 36% over the budget.
What is the engineer required to do?
The construction documents for a new multi-tenant office building are 90% complete. The owner requests that the bid documents include the rough-in of security camera locations and access control points for the building.
Which changes should the architect consider? Check the three that apply.
During the initial construction documents phase meeting, the owner states a strong desire to decrease the time required for the construction documents phase. The owner plans to submit the documents to the building department early for the building permit. Although the project is currently on schedule, the architect plans to comply with the owner's request.
Which action should the architect take?