| Exam Code/Number: | NS0-521Join the discussion |
| Exam Name: | Implementation Engineer - SAN ONTAP Exam |
| Certification: | Network Appliance |
| Question Number: | 67 |
| Publish Date: | May 30, 2026 |
|
Rating
100%
|
|
During maintenance of A NetApp AFF ONTAP cluster, which two steps are needed to move the SAN UFs to new nodes that are members of a portset? (Choose two.)
Which feature enables simultaneous snapshots of multiple LUNs In different volumes?
Which two steps must be taken first to restore a LUN from a SnapMirror Synchronous destination? (Choose two.)
A customer wants to configure an NVMe protocol-based NetApp ONTAP based storage system in a SAN environment.
What is used to configure the list of hosts?
An administrator has a NetApp AFF cluster supporting an application with twelve LUNs allocated across four volumes. There is a requirement to configure a Snapshot copy of all LUNs simultaneously as a single unit.
Which NetApp ONTAP command should be used to configure this requirement?