| Exam Code/Number: | NRN-522Join the discussion |
| Exam Name: | Nokia 5G RAN Network Operations Expert |
| Certification: | Nokia |
| Question Number: | 122 |
| Publish Date: | Nov 23, 2026 |
|
Rating
100%
|
|
Following completion of a hardware replacement and remote piloting activity, which combination of checks represents the most complete final verification before the NOC engineer closes out the activity as successful?
A site reports a 'Rectifier Fault' or 'DC Power Fault' alarm together with multiple equipment alarms across different cabinets. What does the rectifier/DC power fault alarm relate to?
What is a 'threshold crossing alert' (TCA), and how does it differ from a standard equipment fault alarm?
A NOC engineer needs to recover a base station from a state where its parameter settings have been corrupted, but the underlying software load is functioning correctly. Which type of backup would be most directly applicable to resolving this specific issue?
A NOC engineer increases the configuredMaxTxPower parameter for a 5G cell as part of a coverage improvement initiative. What is the most likely operational consequence of this change?