| Exam Code/Number: | NCP-MCI-6.5Join the discussion |
| Exam Name: | Nutanix Certified Professional - Multicloud Infrastructure (NCP-MCI) v6.5 exam |
| Certification: | Nutanix |
| Question Number: | 180 |
| Publish Date: | Jun 08, 2026 |
|
Rating
100%
|
|
How many Prism Central instances are required to deploy Leap:'
An administrator needs to limit the amount of storage space that data stored in single container can consume.
Which action should the administrator take?
Which method can be used to migrate a VM configured for UEFI-boot from a Nutanix Hyper-V cluster to AHV?
Which command should an administrator run from the CLI to view the uplink state of all AHV nodes in the cluster?
Microsegmentation was recently enabled in a Nutanix environment. The administrator wants to leverage Prism Central to create a policy that will block all traffic regardless of direction, between two groups of VMs identified by their category.
Which policy should be used to meet this requirement?