A systems engineer needs to size a new project that requires offsite backup using Vertam The prospect requires an RPO GE 24 hours, and the ability to restore from the past 7 days of backups The prospects data change rate is 1% How should the SE configure Sizer for this scenario?
A prospect's existing SAN-based environment regularly experiences unpredictable storage performance and latency spikes during peak utilization. The most highly affected workload is general server virtualization.
Which Nutanix feature addresses this pain point?
During a sales motion with a new prospect, the prospect asks to do a POC so they can experience Nutanix in their environment.
What is the most important item the SE must have in place with the prospect before moving forward with a POC?
Which three cluster operations require an administrator to reclaim licenses?(Choose three)
A systems engineer is creating a configuration in Sizerfor a customer that is building an app for use as an ebooks repository.
The app requires the following twho workloads.
1. 50 generic web server VMs, each with 2 vCPUs on a 4:1 vCPU:CPU ratio, 8GB of RAM, and 100GB of storage each
2. A fileserver workload with 80TB of usable storage available, which contains mostly PDFs and pre- compressed data Any reduction in performance of the web servers must be avoided. After entering the workloads with default options, The Sizer oupouts the configuration shown in the exhibit.
Which adjustment does the systems engineer need to make to the scenario to meet the performance requirements?