| Exam Code/Number: | 1Z0-1010Join the discussion |
| Exam Name: | Oracle Talent Management Cloud 2018 Implementation Essentials |
| Certification: | Oracle |
| Question Number: | 72 |
| Publish Date: | Jul 20, 2026 |
|
Rating
100%
|
|
A company uses the band method for the overall summary, sum method for the goals section, and average method for the competencies section with rating points. For an employee, the score for the competencies section is 50, and the score for the goals section is 20. The table shows the rating point ranges set up for the overall section rating model to assign the rating level for the overall rating.
What is the overall rating of the employee?
During the talent review meeting, review participants want to see data from five previous meetings; however, the system does not allow this. What is the reason?
An HR specialist recently created a performance goal plan for his or her organization. Two new hires have joined the organization after the existing goal plan was created and assigned.
* Employee 1 is required to have all the goals in the existing goal plan.
* Employee 2 needs goals A1 and A2 in addition to the goals in the existing goal plan.
* Goals A1 and A2 need to be added to the goal library.
Which statement addresses these requirements?