During a Stage 1 audit, the EMS Manager asks that the audit includes coverage of a new storage site on the other side of town that they have taken over since the application was made.
Which two of the following actions should the auditor take?
An oil organisation has a natural gas treatment plant on land crossed by several small rivers. On one particular day, after heavy rainfall for 48 hours, some of those rivers burst their banks and flooded the water treatment facilities of the plant. The oil-contaminated water reached some scarcely populated areas nearby.
Soon after, an internal audit was carried out to particularly analyse this event that was considered a nonconformity. There were no records of such heavy rainfall in the past 200 years.
Which three of the following actions are 'corrections'?
You are conducting a Stage 2 certification audit of VitalSpark, a pharmaceutical organisation manufacturing vitamins and other healthcare medicines.
In a separate area in the centre of their large site, a supplier produces oxygen supplies piped directly into the manufacturing processes of VitalSpark. They also deliver oxygen in bulk tankers to other customers. When you review the environmental aspects register, you find that the only environmental aspect recorded for this arrangement relates to the heavy goods vehicles of the supplier transiting the site.
You ask the EMS Manager about the environmental consequences to VitalSpark of this arrangement and are told that they are not significant since the supplier has its own services for water, sewage, waste and energy.
The EMS Manager tried unsuccessfully to communicate with the supplier who is located inside the VitalSpark site and outside the scope of the EMS.
After gathering more evidence, you note down findings against several clauses of ISO 14001. Determine which three of the findings stated are non-conformities.
ABC is a large lubricant oils manufacturer located in country A. Due to tax exemption and other economic issues, they decided to move the whole plant to a neighbouring country B. They moved every single piece of the plant (equipment, systems); the new plant has the same layout, the same dimensions, the same suppliers of raw materials and the same customers. Even more, most personnel accepted to move to country B.
They operate a third-party certified EMS; the certificate was transferred to the new plant after a half-day audit from the certification body. You are auditing ABC's EMS in the new location, representing ABC's largest customer. When interviewing the Environmental Manager (EM), you ask:
You: Can I see the plan you developed to keep under control the impact of the EMS due to the change of site?
EM: We listed all elements and processes of the EMS that might need to be changed and selected those that we considered needed a careful review and probably a revision.
Below you will find that list; select six that you consider will need to be revised.
An internal auditor of a manufacturer of aluminium products for the car industry raised a nonconformity against section 6.2.2 of ISO 14001 in Report IA202. The nonconformity (NC3) stated:
"Top management has not analysed why none of the environmental objectives set for the last year have been met." A third-party auditor reviewing the internal audit process came across the nonconformity and found that no corrective action was documented. The EMS Manager confirmed no action had been taken, but added he expected a number of objectives to be achieved in the next three months so there was no need for further action. He explained in confidence that the organisation was fighting a takeover bid and resources for environmental projects had been cut.
From the information, select three non-conformities options that the auditor could raise to ISO 14001.