The maintenance engineer creates a single cycle plan with a cyle of 12 months and enters the scheduling indicator time-key date.
Which further scheduling parameter must you enter so that the calcuated call date is always scheduled six months before the planned date? choose 1 answer
In which maintenance object can you use an activity type? Note: There are 2 correct Answers to this question.
Two maintenance package of a maintenance strategy are due at the same time. Which parameter determine that only one of these maintenance package is executed? choose 1 answer
Which of the following is true about calculating the cost for maintenance?
The installation locations for equipment in a technical system are documented in the ___________.