| Exam Code/Number: | C-TSCM42-65Join the discussion |
| Exam Name: | SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP5 |
| Certification: | SAP |
| Question Number: | 80 |
| Publish Date: | Jul 19, 2026 |
|
Rating
100%
|
|
A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order. The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists.
Which of the following statements are true for the two lists at this stage? (Choose two)
Which of the following activities is necessary for the capacity availability check to be carried out automatically when a production order is released?
An enterprise based in the US produces an end product that is used with the unit of measure "pound" (LB). The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit "kilogram" (KG).
What is the easiest way to fulfill this requirement?
The stock/requirements list for a finished product contains only one customer order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date of the fixed planned order is set to a later date compared to the one of the customer order. However, a corresponding rescheduling exception message does not occur.
What could be the reason? (Choose two)
Which of the following statements about the planning functions available in SAP ECC is correct?