Which functions can be triggered before releasing a production order?(Choose three)
In the Customizing for requirements planning, a project team notices that the alternatives P1, P2, P3 and P4 are also delivered as standard in addition to MRP type PD. The number in each of these alternatives represents a firming type.
What does a firming type define?(Choose two)
In SAP ECC, you calculate the standard available capacity for a work center capacity using the followingdata:
-Start: 7:00:00 a.m. -End:3:00:00 p.m.
-Break duration: 1 hour
-Rate of utilization: 80% -Overload:110%
-Number of individual capacities: 1
How large is the standard available capacity?
A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order. The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists.
What do you have to consider for the two lists at this stage?(Choose two)
You have maintained planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a material. For the coming months, you have planned requirements with requirement type LSF (derived from main strategy 10). Now, you want to change therequirement type from LSF to VSF (in accordance with planning strategy 40, planning with final assembly) for requirements in the existing production plan.
Which of the following scenarios are applicable in this case?(Choose two)