What are the prerequisites for carrying out material requirements planning (MRP) for a plant? Note; There are 2 correct answers to this question.
Correct Answer: B,D
Explanation Material requirements planning (MRP) is a process that calculates the net requirements and generates planned orders or purchase requisitions for materials based on various factors, such as demand, supply, lead time, lot size, safety stock, etc. To carry out MRP for a plant, some prerequisites are needed. Two of them are: Maintain MRP data in the material master record for the materials to be planned automatically: This prerequisite is necessary, as the MRP data contains the parameters that control how the system plans the material, such as MRP type, MRP group, MRP controller, lot size, procurement type, special procurement, etc. Without these parameters, the system cannot determine the optimal quantity and timing of the material requirements. Maintain plant parameters for the corresponding plant in Customizing: This prerequisite is necessary, as the plant parameters define the global settings that apply to all materials in the plant, such as planning horizon, planning calendar, opening period, scheduling margin key, etc. These settings influence how the system calculates the dates and quantities of the planned orders or purchase requisitions.
Question 17
Where can you set the parameter that allows changing the account assignment data for a consumable material during invoice receipt?
Correct Answer: C
Question 18
Which of the following are possible personalization options of the SAP Fiori launchpad? Note: There are 2 correct answers to this question.
Correct Answer: B,D
Question 19
What is one difference between the SAP Fiori launchpad and the classical SAP Graphical User Interface (SAP GUI)?
Correct Answer: C
Question 20
What must you consider when defining purchasing organizations? Note: There are 2 correct answe to this question.