Reducing batch sizes might have the following impact: (choose all that apply)
Which of the following is TRUE about the relationship between Sprints and Kanban for Scrum? (choose the best three answers)
True or False: A team should change their WIP limit, at the Daily Scrum, if an urgent unplanned item enters a Sprint and the team is at the maximum WIP limit.
The Cumulative Flow Diagram is most helpful in visualizing which of the following two metrics? (choose the best two answer)
True or False: The primary purpose of measuring Work Item Age is to identify bottlenecks in the workflow that will need to be addressed.