Following the Scrum theory, how should a group of 50 people be divided into multiple Scrum Teams?
If the Product Owner has concerns about the Definition of Done (DoD) - what should the Product Owner do?
Which two of the following are correct about the Product Owner accountability (role = outdated term)?