Which of the following projects is eligible to pursue the Energy and Atmosphere Prerequisite, Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?
Plug-in task lighting will be utilized in a LEED project at all workstations. The task lighting is not included in the installed lighting power calculations for Energy and Atmosphere Prerequisite, Minimum Energy Performance since
When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following must be included in the Basis of Design (BOD)?
What type of project would benefit from showing compliance with Energy and Atmosphere Prerequisite, MinimumEnergy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?
A project's total site area is 240,000 ft2 (22 297 m2) and the building footprint is 40,000 ft2 (3 716 m2). How much outdoor space and vegetated space must it provide to earn Sustainable Sites Credit, Open Space?