FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. USGBC Certification
  3. LEED-AP-BD-C Exam
  4. USGBC.LEED-AP-BD-C.v2025-06-23.q228 Dumps
  • ««
  • «
  • …
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • …
  • »
  • »»
Download Now

Question 71

Plug-in task lighting will be utilized in a LEED project at all workstations. The task lighting is not included in the installed lighting power calculations for Energy and Atmosphere Prerequisite, Minimum Energy Performance since

Correct Answer: C
Plug-in task lighting is considered as furniture and is not included in the installed lighting power calculations for Energy and Atmosphere Prerequisite, Minimum Energy Performance. It is also not required to comply with the lighting control requirements of ASHRAE 90.1-2010. However, it can be used to satisfy the individual control requirement of Indoor Environmental Quality Credit, Interior Lighting, Option 1. Reference:
LEED v4 for Building Design and Construction, p. 361
LEED v4 for Building Design and Construction, p. 6012
ASHRAE 90.1-2010, Section 9.1.13
insert code

Question 72

A project is designed to remodel an existing warehouse into multi-family housing. The exterior facade of the warehouse will remain, but 40% of the interior will be demolished and replaced for interior new construction.
New materials will be used for the new construction. To achieve points in the Materials and Resources Credit, Building Life-Cycle Impact Reduction, which credit path option would apply?

Correct Answer: D
Explanation
This option applies to projects that renovate an existing building that meets the definition of abandoned or blighted, and use new materials for at least 50% of the surface area. The project meets these criteria, as the warehouse is an existing building that is presumably abandoned or blighted, and the new construction will use new materials for 40% of the interior and some of the exterior. References: LEED v4: Building Design + Construction Guide, Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4:
Renovation of Abandoned or Blighted Building
------
insert code

Question 73

A developer is considering an urban infill site for a new commercial building rather than a rural greenfield site adjacent to a stream. Which of the following is an economic advantage of the infill site?

Correct Answer: C
An economic advantage of the infill site is that it reduces the need for new utility infrastructure. This is because the infill site is located within an existing urban area that already has access to water, sewer, electricity, and other utilities1. The developer can save on the costs of extending or installing new utility lines and services to the rural greenfield site, which may not have adequate or reliable utility infrastructure2. The other options are not economic advantages, but rather environmental benefits of the infill site. Protecting greenfields and farmland, preserving habitat and natural resources, and reducing potential damage to an existing stream are all positive outcomes of avoiding development on the rural greenfield site, but they do not directly translate into monetary savings for the developer3.
insert code

Question 74

An existing vacant office building will be completely renovated and new mechanical, electrical and plumbing systems will be installed. 20% of the building's gross floor area will be complete at the time of certification. There will be a data center and some retail stores on the ground floor of the building at a future date. Which rating system is applicable for the building?

Correct Answer: C
This rating system is suitable for projects where the developer controls the design and construction of the entire core and shell base building, but has no control over the design and construction of the tenant fit-out. Since the building will have a data center and retail stores in the future, but these are not the primary function of the entire building, LEED BD+C: Core & Shell is more appropriate than LEED BD+C: Data Centers or LEED BD+C: Retail.
insert code

Question 75

For a bicycle network to demonstrate compliance with Location and Transportation Credit, Bicycle Facilities, the bicycle network must connect to

Correct Answer: D
According to the LEED v4: Building Design + Construction Guide, the bicycle network must connect to a rapid transit stop that is within 3 mi. (5 km) biking distance of the project boundary. This is one of the options to meet the requirement for Option 1: Bicycle Network and Storage. The other options are to connect to at least 10 diverse uses or to connect to a school or employment center that is within 3 mi. (5 km) biking distance of the project boundary. References: LEED v4: Building Design + Construction Guide, Location and Transportation Credit: Bicycle Facilities, Option 1: Bicycle Network and Storage1
insert code
  • ««
  • «
  • …
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • …
  • »
  • »»
[×]

Download PDF File

Enter your email address to download USGBC.LEED-AP-BD-C.v2025-06-23.q228 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.