FreeQAs
 Request Exam  Contact
  • Home
  • View All Exams
  • New QA's
  • Upload
PRACTICE EXAMS:
  • Oracle
  • Fortinet
  • Juniper
  • Microsoft
  • Cisco
  • Citrix
  • CompTIA
  • VMware
  • ISC
  • SAP
  • EMC
  • PMI
  • HP
  • Salesforce
  • Other
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. USGBC Certification
  3. LEED-AP-BD-C Exam
  4. USGBC.LEED-AP-BD-C.v2026-04-11.q171 Dumps
  • ««
  • «
  • …
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • »
Download Now

Question 161

A neighborhood housing development organization has dual goals, promoting occupant's health and minimizing energy costs. What LEED Building Design and Construction, New Construction credit might the LEED AP propose to best achieve the organization's dual goals?

Correct Answer: B
The Energy and Atmosphere Credit, Optimize Energy Performance, is the most suitable for achieving the organization's dual goals. This credit encourages the use of energy-efficient strategies to reduce the environmental and economic harms associated with excessive energy use, thereby promoting occupants' health and minimizing energy costs.References: LEED AP Building Design + Construction (LEED AP BD+C) V4 resources 1
insert code

Question 162

A school project is located in a basin. Snow melts in the spring on the nearby mountains which replenishes the local water supply. The nearby highways are sometimes closed during the winter due to the winter storm.
What is the top priority the project team should focus on?

Correct Answer: B
This option requires the project team to focus on reducing the water consumption of the school project, because it is located in a basin that depends on the seasonal snowmelt for its water supply1. Installing efficient plumbing fixtures, such as low-flow faucets, toilets, and showerheads, can help save water and reduce the demand on the local water resources2. This option can also help the project achieve the LEED credits for outdoor and indoor water use reduction3.
References: = LEED v4: Building Design + Construction Guide, Water-Efficient Plumbing Fixtures, Water Efficiency | U.S. Green Building Council.
insert code

Question 163

The Exemplary Performance threshold for Sustainable Sites Credit, Rainwater Management requires:

Correct Answer: C
Detailed
Exemplary Performance for Rainwater Management requires achieving both Option 1 (Percentile of Rainfall Events) and Option 2 (Natural Land Cover Conditions). This demonstrates a superior level of stormwater management by addressing both the volume and quality of runoff, aligning with LEED's goals of reducing stormwater impacts on surrounding ecosystems and water infrastructure.
insert code

Question 164

When the project occupancy is not known, which method is recommended?

Correct Answer: A
This method is recommended when the project occupancy is not known, because it provides the default occupant density values for various space types, such as offices, classrooms, retail, and restaurants1. These values are based on the typical or average occupancy of similar spaces, and can be used to estimate the ventilation requirements and energy performance of the project2.
References: = LEED v4: Building Design + Construction Guide, ASHRAE 62.1-2010, Table 6-1.
insert code

Question 165

Which of the following strategies is allowed under Energy Atmosphere Credit, Renewable Energy Production, and will help a project achieve Energy Atmosphere Credit, Optimize Energy Performance?

Correct Answer: A
Install an on-site photovoltaic array
Installing an on-site photovoltaic array is a direct method to produce renewable energy on the project site, which can be used to achieve points under the Energy Atmosphere Credit for Renewable Energy Production.
Additionally, it contributes to optimizing energy performance by generating clean electricity on-site and reducing the need for energy from non-renewable sources.
insert code
  • ««
  • «
  • …
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • »
[×]

Download PDF File

Enter your email address to download USGBC.LEED-AP-BD-C.v2026-04-11.q171 Dumps

Email:

FreeQAs

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 FreeQAs

www.freeqas.com materials do not contain actual questions and answers from Cisco's certification exams.