| Exam Code/Number: | UiPath-ADAv1Join the discussion |
| Exam Name: | UiPath Automation Developer Associate v1 Exam |
| Certification: | UiPath |
| Question Number: | 384 |
| Publish Date: | Jul 15, 2026 |
|
Rating
100%
|
|
While creating a process automation pipeline, what process attribute should be avoided to ensure there are minimal or no automation maintenance requirements?
A developer created three variables used in the workflow shown below:
Instructions: Based on best practices, select the correct Scope for each Variable type from the drop-down lists shown in the following exhibit.

A developer created a datatable, dt_Users as shown in the following exhibit.
After populating the datatable variable, the developer wants to assign each User ID in dt_Users to a List<String> variable Users_List. To achieve this, the developer plans to use an Add To Collection activity inside a For Each Row activity.
How should the Item property of the Add To Collection activity be configured?
Which activity should be used inside a Use Excel File scope to be able to sort a table directly in an .xlsx file?
Which is an example of when an application might use a Scheduled Script Execution (Scheduled Job)?
UiPath.UiPath-ADAv1.v2025-07-31.q108
Jul 31, 2025
UiPath.UiPath-ADAv1.v2024-05-27.q139
May 27, 2024