An administrator is unable to log into the vRealize Operations (vROps) UI and therefore logs into the vROps Admin Ul to begin troubleshooting. Once logged into the Admin UI, the Mowing error message has been displayed:
The Cluster was shut down because one or more nodes were out of disk space.
The following information has been provided on the vROps deployment:
* The vROps cluster contains three nodes.
* Each node in the vROps duster has been hardened.
* Continuous Availability (CA) and High Availability (HA) is not configured.
Drag and drop the four correct actions the administrator must complete to troubleshoot the cause of the issue from the action list on the left and place the actions into the correct sequence on the right. (Choose four.)

An administrator has been tasked with deploying vRealize Operations using vRealize Suite Lifecycle Manager (vRSLCM). Which two options are steps in the process? (Choose two.)
Refer to the exhibit.
A cloud administrator is deploying a new VMware Cloud on AWS virtual private cloud (VPC). After clicking on deploy, the screen refreshes and displays the information that is provided in the exhibit.
What is the issue with the management CIDR that is causing the deployment to fall?
What are two incident management services included in the VMware Cloud on AWS service management process? (Choose two)
What must a cloud administrator configure in order to allow a company's on-premises data center to access the VMware Cloud on AWS vCenter Server.