A telecom company has purchased NSX-T as part of a Software Defined Data Center (SDDC) initiative. The company wants to ensure the highest performance for network traffic leaving the virtual environment.
An NSX-T Architect is working in a brownfield environment with 4 ESXi hosts. These constraints were documented:
new servers cannot be purchased
North/South bandwidth must be guaranteed
Top-of-Rack switches have additional uplinks
Which three recommendations should the architect implement? (Choose three.)
Which two resources can be used by an NSX architect during the Assessment Phase? (Choose two.)
An architect is helping an organization with the Conceptual Design of an NSX-T Data Center solution. This information was gathered by the architect during the Discover Task of the Engagement Lifecycle:
There are applications which use IPv6 addressing.
Network administrators are not familiar with NSX-T Data Center solutions.
Hosts can only be configured with two physical NICs.
There is an existing management cluster to deploy the NSX-T components.
Dynamic routing should be configured between the physical and virtual network.
There is a storage array available to deploy NSX-T components.
Which two requirements were documented by the architect? (Choose two.)
An architect is helping an organization with the Physical Design of an NSX-T Data Center solution. This information was gathered during a workshop about ESXi Host networking:
A total of 50 ESXi hosts to be configured as Transport Nodes.
All ESXi hosts have a dedicated 2 X Intel 10Gbps Physical Network adapter for the Overlay Traffic.
To achieve low latency, high throughput, redundancy, and performance, which two NIC teaming policies should the architect recommend? (Choose two.)